East Clinton Fire Department

Special Notices:
 

Note: The attached facility evaluation contains preliminary cost estimates. Be aware, the cost estimates are based on a proposed square footage of a typical commercial facility and should not be utilized for any firm plans or construed as budget numbers. There are no firm plans, construction costs are currently very volatile, and there is much that needs to be done before any construction cost estimates can be considered for budgeting purposes. 

 

East Clinton Fire District feasibility study with disclaimer

folder 2018 Reports

Documents

pdf ECFD 10-31-18 BR (1047 downloads) Popular
pdf ECFD 4 30 2018 BR (1095 downloads) Popular
pdf ECFD 5 31 18 BR (1088 downloads) Popular
pdf ECFD 8 31 18 BR (1094 downloads) Popular
pdf ECFD 9-30-18 BR (1026 downloads) Popular
pdf ECFD Profit and Loss Report 6 30 18 (1135 downloads) Popular